Right-click options

When you right-click an object in the Berth Scheduler window, a pop-up menu appears. The menu options differ depending on the selected access mode and the object you click. The following table describes all menu options and lists the objects and access modes for which an option is available.

If no options are available, right-clicking an object opens an information dialog.

All options are also available from the Actions drop-down list (on page 1).

Menu option

Description

Right-clicked object

Access mode

Properties

Opens an information dialog that displays details on the clicked object. For example, if you right-click a vessel visit, you can view estimated and actual container move counts for a vessel visit.

N4 polls actual move count updates every 20 seconds, so move completions do not instantaneously update the actual move count.

All objects

All modes

Info

Opens the Vessel Call Detail dialog box for the selected vessel visit.

The information in this window is read-only. To edit vessel visit details, use the N4 client (N4 client Operations Vessel Vessel Visits Vessel Visits view Actions Edit Visit Details Edit Vessel Visit Details form).

Vessel block

Live Update

Crane Plan Assign

Open Ship

Opens the vessel profile view for the selected vessel visit.

Vessel block

Live Update

PrePlanner

Crane Plan Assign

Launch Shift View For Visit

Opens a Work Shifts window filtered by the selected vessel visit.

Vessel block

Crane Plan Assign

Delete shifts for visit

Deletes the crane shifts for the selected vessel visit.

Vessel block

Crane Plan Assign

Edit Berthing Activities

Opens the Activities window for the selected vessel visit. See also Add or edit vessel berthing activities (on page 1).

Vessel block

All modes

Launch Transshipment Tracker

Opens the Transshipment Tracker window for the selected vessel visit. See Tracking transshipments.

Vessel block

All modes

To revert, select/revert from View Actions.

Explains how to revert a preplanned vessel move: From the Actions drop-down list, select Revert Selected Preplanned Changes.

Vessel block

PrePlanner

Save visit preplan to DB

Saves the preplan of the selected vessel visit.

In the Actions drop-down list, this option is called Save Only Selected Preplanned Changes.

Vessel block

PrePlanner

Launch Shift View For POW

Opens a Work Shifts window filtered by the selected crane's point of work (POW).

Crane, Crane cable reach limit

All modes

To Edit Cable Reach, Maintain Cranes and RDTs

Identifies where to edit the reach limits of the crane cables (Files Maintain Cranes and RDTs). For more information, see Modify crane reach limits (on page 1).

All objects

All modes

Edit Bar Thickness (BSCRTH)

Opens the Vessel/Berth Parameters window, where you can edit the BSCRTH (on page 1) parameter to adjust the thickness of the crane bars in the Berth Scheduler window.

See Configure ABS display parameters (on page 1).

Crane cable reach limit

Live Update

PrePlanner

Crane Plan Assign

Edit Spacing Between Bar Thickness (BSCRVS)

Opens the Vessel/Berth Parameters window, where you can edit the BSCRVS (on page 1) parameter to adjust the thickness of spacing between crane bars in the Berth Scheduler window.

See Configure ABS display parameters (on page 1).

Crane cable reach limit

Live Update

PrePlanner

Crane Plan Assign

Launch Matching Vessel Schedule

Opens the Vessel Schedule window filtered by the vessel visits in the Berth Scheduler window.

The information in this window is read-only. To edit vessel visit details, use the N4 client (N4 client Operations Vessel Vessel Visits Vessel Visits view Actions Edit Visit Details Edit Vessel Visit Details form).

Shift bar

Live Update

Read Only

Crane Plan Read Only

Crane Plan Assign

Resize Berth Scheduler to match selection

Crops the displayed information to the selected shift, which is outlined in orange.

Shift bar

Live Update

Read Only

Crane Plan Read Only

Crane Plan Assign

Add day to start of boundary

Adds a day before the selected shift, which is outlined in orange.

Shift bar

Live Update

Read Only

Crane Plan Read Only

Crane Plan Assign

Add day to end of boundary

Adds a day after the selected shift, which is outlined in orange.

Shift bar

Live Update

Read Only

Crane Plan Read Only

Crane Plan Assign